Number of Projects
65
Sectors
15
Total Amount in GHS
GH¢ 57,316,457.69
Total Amount in USD
USD 130,967,906.39

Project List

# PROJECT NAME SECTOR BUDGET ENTITY STAGE FUNDING SOURCE CONTRACT TYPE
1 Upgrading Of Kokompe Light-Industrial Enclave Economy GH¢ 3,454,989.45 Sekondi-Takoradi Metropolitan Assembly completed Agence Française de Développement construction View Details
2 Upgrading Of 2no. Paid Parking Lots At Tarkwa Economy GH¢ 495,000.00 Tarkwa Nsuaem Municipal Assembly Minerals Development Fund construction View Details
3 Construction Of Cassava Processing Centre Economy GH¢ 382,263.00 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant construction View Details
4 Construction Of One (1) No. 30 Bay Partitioned Market Shed At East Tanokrom Economic GH¢ 198,482.50 Effia-Kwesimintsim Municipal Assembly DACF - Responsiveness Factor Grant construction View Details
5 Construction Of Youth Development Centre Economic GH¢ 1,711,562.50 Sekondi-Takoradi Metropolitan Assembly World Bank construction View Details
6 Construction And Completion Of The Four Storey Library Compex Education GH¢ 5,103,230.16 Sekondi-Takoradi Metropolitan Assembly World Bank construction View Details
7 Construction Of Addtional 10 Blocks Of Garages At Kansaworodo Kokompe Economic GH¢ 1,476,455.00 Sekondi-Takoradi Metropolitan Assembly Agence Française de Développement construction View Details
8 Construction Of A 600mm U-Drain With Slab At Sekondi Transport.Road GH¢ 646,235.00 Sekondi-Takoradi Metropolitan Assembly Agence Française de Développement construction View Details
9 Construction Of A 900mm U-Drain With Slab,And 1.5m Rectangular Drain Transport.Road GH¢ 941,737.00 Sekondi-Takoradi Metropolitan Assembly Agence Française de Développement construction View Details
10 Construction Of 100 Bed Capacity Dormitory Block With Ancillary Facility For Sekondi School For The Deaf- Lot 1 Education GH¢ 750,781.96 Shama District Assembly completion District Assemblies Common Fund construction View Details
11 Construction Of Out-Patient Department Block Health GH¢ 329,965.65 Wassa East District Assembly implementation District Assemblies Common Fund construction View Details
12 Reconstruction Of 1no. Open Market Shed And Drainage Works At Assakae Market (Phase Ii) Economic GH¢ 175,885.50 Effia-Kwesimintsim Municipal Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
13 Construction Of 1 No. Chps Compound At Yabiw Health GH¢ 307,949.98 Ahanta West Municipal Assembly completed DACF - Responsiveness Factor Grant construction View Details
14 Construction Of 1 No. 6 Unit Classroom Block Education GH¢ 550,000.00 Tarkwa Nsuaem Municipal Assembly completed Minerals Development Fund Lump Sum View Details
15 Construction Of 1no. 2 Unit Classroom Block At Allah-Essuna Primary School Education GH¢ 135,014.34 Nzema East Municipal Assembly completed DACF - Responsiveness Factor Grant construction View Details
16 Construction Of 1no. 3-Unit Classroom Block With Office And Store At Ologo Education GH¢ 338,181.11 Wassa East District Assembly completed DACF - Responsiveness Factor Grant construction View Details
17 Construction Of Office Block For Dvla At Ayisakro Transport.Road GH¢ 626,937.15 Nzema East Municipal Assembly completed District Assemblies Common Fund Advertisement for Expression of Interest View Details
18 Construction Of 2-Unit Classroom Block Education GH¢ 278,738.39 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
19 Construction Of Final Floor Of 17 Bay Lockable Stores Economic GH¢ 521,702.55 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
20 Construction Of 10 Seater Wc Waterandwaste GH¢ 183,450.13 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant construction View Details
21 Construction Of 1no. 6-Unit Classroom Block Education GH¢ 500,000.00 Tarkwa Nsuaem Municipal Assembly completed Minerals Development Fund Lump Sum View Details
22 Provision Of Water Facilities In Selected Communities And Construction Of Market Shed At Light Industrial Area Transport.Water GH¢ 252,215.24 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant construction View Details
23 Construction Of 1no. 3 Unit Classroom Block With Acilliary Facility Education GH¢ 252,215.24 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant construction View Details
24 Renovation 14 Unit Classroom Block With Ancillary Facilities For Lagos Town M/A Primary School Education GH¢ 294,922.53 Effia-Kwesimintsim Municipal Assembly completed District Assemblies Common Fund Admeasurement View Details
25 Construction Of 1no. 3 Unit Classroom Block With Ancillary Facilities At Akwidaa Education GH¢ 339,236.64 Ahanta West Municipal Assembly completed DACF - Responsiveness Factor Grant construction View Details
26 Construction & Furnishing Of One(1) Community Based Planning Service (Chps) Compound At Adientem (Phase 1) Health GH¢ 488,241.10 Effia-Kwesimintsim Municipal Assembly completed DACF - Responsiveness Factor Grant construction View Details
27 Construction Of Storm Drain From Kojo Kumi Avenue, Kwesimintsim Total Filling Station And Kwesimintsim Transport.Road GH¢ 3,297,752.30 Effia-Kwesimintsim Municipal Assembly completed World Bank Admeasurement View Details
28 Construction Of 1no. 2unit Classroom Block, Office And Store, Servery,4-Seater W/C With Borehole Education GH¢ 413,479.06 Ahanta West Municipal Assembly completed DACF - Responsiveness Factor Grant construction View Details
29 Construction Of 1no. 3-Unit Classroom Block Education GH¢ 292,302.90 Mpohor District Assembly DACF - Responsiveness Factor Grant Admeasurement View Details
30 Construction Of 1 No. 3 Unit Classroom Block At Sekyere Himan Education GH¢ 331,443.26 Wassa East District Assembly implementation DACF - Responsiveness Factor Grant construction View Details
31 Construction Of 1 No. 16 Seater Wc Toilet With Mechanized Borehole At Nsadweso Waterandwaste GH¢ 186,678.45 Wassa East District Assembly completed Minerals Development Fund Admeasurement View Details
32 Construction Of 1no. 2-Unit Classroom Block Education GH¢ 300,000.00 Tarkwa Nsuaem Municipal Assembly implementation Minerals Development Fund Lump Sum View Details
33 Construction Of 1no. 6-Unit Classroom Block Education GH¢ 500,000.00 Tarkwa Nsuaem Municipal Assembly Minerals Development Fund Lump Sum View Details
34 Construction Of 1 No 3 Unit Classroom Block With Ancillary Facility At Asemko Education GH¢ 271,661.89 Ahanta West Municipal Assembly completed District Assemblies Common Fund construction View Details
35 Construction Of 1no. 3-Unit Classroom Block Education GH¢ 400,000.00 Tarkwa Nsuaem Municipal Assembly implementation DACF - Responsiveness Factor Grant construction View Details
36 Construction Of Open Shed Waterandwaste GH¢ 196,077.40 Sekondi-Takoradi Metropolitan Assembly completed Uk-Aid Direct Lump Sum View Details
37 Construction Of Chps Compound At Komfueku Health GH¢ 495,939.36 Shama District Assembly completed DACF - Responsiveness Factor Grant Lump Sum View Details
38 Construction Of 1 No 3 – Unit Classroom Block With Ancillary Facilities Education GH¢ 242,285.32 Ahanta West Municipal Assembly DACF - Responsiveness Factor Grant Lump Sum View Details
39 Construction Of Community Park With Ancillary Facilities Phase 1 Culturesportsandrecreation GH¢ 549,646.38 Shama District Assembly completion DACF - Responsiveness Factor Grant Lump Sum View Details
40 Construction Of Four Unit Teachers Bedroom With Ancillary Facilities For School For The Deaf Education GH¢ 451,449.40 Shama District Assembly District Assemblies Common Fund Lump Sum View Details
41 Rehabilitation Of 12-Unit Classroom Block And Offices, 200 Bed Capacity Dormitory, Provision Of Street Light And Repair Of Existing Broken Fence Wall For School For The Deaf Education GH¢ 456,635.45 Shama District Assembly District Assemblies Common Fund Lump Sum View Details
42 Construction Of Proposed Two (2) Storey Health GH¢ 455,171.90 Sekondi-Takoradi Metropolitan Assembly implementation District Assemblies Common Fund Admeasurement View Details
43 Construction Of 1no. 32 Bay Partitioned Market Shed Economic GH¢ 199,042.30 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
44 Construction Of 1no. 32 Bay Partitioned Market Shed ( Mpintsin Market) Economic GH¢ 192,861.54 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
45 Construction Of 1no. 40 Bay Partitioned Market Shed Health GH¢ 230,122.60 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
46 Construction Of Proposed Teachers Accommodation. Education GH¢ 303,982.36 Sekondi-Takoradi Metropolitan Assembly implementation DACF - Responsiveness Factor Grant Admeasurement View Details
47 Construction Of 1no. Fish Smoking Facility (Sekondi Beach Area) Economic GH¢ 398,933.73 Sekondi-Takoradi Metropolitan Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
48 Construction Of Police Station At Gwira Banso Governance GH¢ 237,541.91 Nzema East Municipal Assembly implementation DACF - Responsiveness Factor Grant Admeasurement View Details
49 Construction Of Male And Female Wards And Laboratory Facilities And Landscaping Health GH¢ 545,651.30 Tarkwa Nsuaem Municipal Assembly implementation DACF - Responsiveness Factor Grant Lump Sum View Details
50 Rehabilitation Of Municipal Health Directorate Office At Axim Health GH¢ 170,231.18 Nzema East Municipal Assembly implementation DACF - Responsiveness Factor Grant Admeasurement View Details
51 Completion Of 6-Unit Classroom Block With Ancillary Facilities (Ground Floor Only) Education GH¢ 471,922.19 Sekondi-Takoradi Metropolitan Assembly implementation District Assemblies Common Fund Admeasurement View Details
52 Construction Of 2 – Unit Classroom Block With Dining Hall, Office, Kitchen, Toilet/Bath And External Works (Ground Floor Only) Education GH¢ 388,920.97 Sekondi-Takoradi Metropolitan Assembly Ghana Education Trust Fund Admeasurement View Details
53 Construction Of 18m X 1.8m Pedestrian Footbridge At Kwesimintsim Transport.Urban GH¢ 80,204.00 Effia-Kwesimintsim Municipal Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
54 Construction Of 1no. 2 Unit Classroom Block At Kakusuazo Education GH¢ 175,278.82 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant Admeasurement View Details
55 Construction Of 1no. 3unit Classroom Block At Kakabo Education GH¢ 548,214.70 Wassa East District Assembly completed DACF - Responsiveness Factor Grant Admeasurement View Details
56 Construction Of 1no.Chps Compound At Himanso Health GH¢ 347,679.00 Wassa East District Assembly implementation DACF - Responsiveness Factor Grant Admeasurement View Details
57 Construction Of Training Centre At Sekondi Education GH¢ 1,197,850.45 Sekondi-Takoradi Metropolitan Assembly implementation European Union (EU) Admeasurement View Details
58 Construction Of 1no. Mechanized Borehole At Tumentu Socialhousing GH¢ 32,000.00 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant Admeasurement View Details
59 Construction Of 1no.6 Unit Classroom Block, 1no. 3 Seater Toilet Facility, 1no. 2 Urinal Facility And 130 Dual Desk For Basic School At Ampansie Education GH¢ 750,079.27 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant Admeasurement View Details
60 Construction Of 1 No. Shed And Provision Of 5 Unit Stoves For Akyeke Production, Provision Of Basins And Water Drums, Office Fittings And Furniture, Provision Of Motor King And Orientation Training On Cassava Value Chain At Bokro Cassava Processing Centre Economic GH¢ 171,100.00 Nzema East Municipal Assembly DACF - Responsiveness Factor Grant Admeasurement View Details
61 Rehabilitation Of 1.6km Wamco Effiakuma Road With 3mx2m Box Culvet,12mm Long Drain Culvert Transport.Road GH¢ 5,707,993.83 Effia-Kwesimintsim Municipal Assembly World Bank Admeasurement View Details
62 Construction Of Culverts With Roadside Drains And Culvert Approach Fillings At White Diamonds ,Anaji Choice Mart,Takoradi Technical Institute Transport.Road GH¢ 4,000,270.26 Effia-Kwesimintsim Municipal Assembly World Bank Admeasurement View Details
63 Construction Of Culverts With Culvert Approach Filling And Roadside Drains Roads GH¢ 3,599,351.95 Effia-Kwesimintsim Municipal Assembly World Bank Admeasurement View Details
64 Asphalt And Bitumen Surfacing Of Assakae-Whindo Road(2.0km) And Whindo Health Centere Road (5km) Roads GH¢ 6,204,956.56 Effia-Kwesimintsim Municipal Assembly World Bank Admeasurement View Details
65 Construction Of 10no. Refuse Collection Points And Fabrication Of 10no Containers Waterandwaste GH¢ 1,786,353.58 Effia-Kwesimintsim Municipal Assembly World Bank Lump Sum View Details
#1 Upgrading Of Kokompe Light-Industrial Enclave
PROJECT NAME
Upgrading Of Kokompe Light-Industrial Enclave
SECTOR
Economy
BUDGET
3,454,989.45
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
Agence Française de Développement
CONTRACT TYPE
construction
#3 Upgrading Of 2no. Paid Parking Lots At Tarkwa
PROJECT NAME
Upgrading Of 2no. Paid Parking Lots At Tarkwa
SECTOR
Economy
BUDGET
495,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
construction
#4 Construction Of Cassava Processing Centre
PROJECT NAME
Construction Of Cassava Processing Centre
SECTOR
Economy
BUDGET
382,263.00
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#5 Construction Of One (1) No. 30 Bay Partitioned Market Shed At East Tanokrom
PROJECT NAME
Construction Of One (1) No. 30 Bay Partitioned Market Shed At East Tanokrom
SECTOR
Economic
BUDGET
198,482.50
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#6 Construction Of Youth Development Centre
PROJECT NAME
Construction Of Youth Development Centre
SECTOR
Economic
BUDGET
1,711,562.50
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
construction
#7 Construction And Completion Of The Four Storey Library Compex
PROJECT NAME
Construction And Completion Of The Four Storey Library Compex
SECTOR
Education
BUDGET
5,103,230.16
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
construction
#8 Construction Of Addtional 10 Blocks Of Garages At Kansaworodo Kokompe
PROJECT NAME
Construction Of Addtional 10 Blocks Of Garages At Kansaworodo Kokompe
SECTOR
Economic
BUDGET
1,476,455.00
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
Agence Française de Développement
CONTRACT TYPE
construction
#9 Construction Of A 600mm U-Drain With Slab At Sekondi
PROJECT NAME
Construction Of A 600mm U-Drain With Slab At Sekondi
SECTOR
Transport.Road
BUDGET
646,235.00
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
Agence Française de Développement
CONTRACT TYPE
construction
#10 Construction Of A 900mm U-Drain With Slab,And 1.5m Rectangular Drain
PROJECT NAME
Construction Of A 900mm U-Drain With Slab,And 1.5m Rectangular Drain
SECTOR
Transport.Road
BUDGET
941,737.00
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
Agence Française de Développement
CONTRACT TYPE
construction
#11 Construction Of 100 Bed Capacity Dormitory Block With Ancillary Facility For Sekondi School For The Deaf- Lot 1
PROJECT NAME
Construction Of 100 Bed Capacity Dormitory Block With Ancillary Facility For Sekondi School For The Deaf- Lot 1
SECTOR
Education
BUDGET
750,781.96
ENTITY
Shama District Assembly
STAGE
completion
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
construction
#13 Construction Of Out-Patient Department Block
PROJECT NAME
Construction Of Out-Patient Department Block
SECTOR
Health
BUDGET
329,965.65
ENTITY
Wassa East District Assembly
STAGE
implementation
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
construction
#14 Reconstruction Of 1no. Open Market Shed And Drainage Works At Assakae Market (Phase Ii)
PROJECT NAME
Reconstruction Of 1no. Open Market Shed And Drainage Works At Assakae Market (Phase Ii)
SECTOR
Economic
BUDGET
175,885.50
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#15 Construction Of 1 No. Chps Compound At Yabiw
PROJECT NAME
Construction Of 1 No. Chps Compound At Yabiw
SECTOR
Health
BUDGET
307,949.98
ENTITY
Ahanta West Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#18 Construction Of 1 No. 6 Unit Classroom Block
PROJECT NAME
Construction Of 1 No. 6 Unit Classroom Block
SECTOR
Education
BUDGET
550,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
completed
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
Lump Sum
#19 Construction Of 1no. 2 Unit Classroom Block At Allah-Essuna Primary School
PROJECT NAME
Construction Of 1no. 2 Unit Classroom Block At Allah-Essuna Primary School
SECTOR
Education
BUDGET
135,014.34
ENTITY
Nzema East Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#20 Construction Of 1no. 3-Unit Classroom Block With Office And Store At Ologo
PROJECT NAME
Construction Of 1no. 3-Unit Classroom Block With Office And Store At Ologo
SECTOR
Education
BUDGET
338,181.11
ENTITY
Wassa East District Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#22 Construction Of Office Block For Dvla At Ayisakro
PROJECT NAME
Construction Of Office Block For Dvla At Ayisakro
SECTOR
Transport.Road
BUDGET
626,937.15
ENTITY
Nzema East Municipal Assembly
STAGE
completed
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Advertisement for Expression of Interest
#23 Construction Of 2-Unit Classroom Block
PROJECT NAME
Construction Of 2-Unit Classroom Block
SECTOR
Education
BUDGET
278,738.39
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#24 Construction Of Final Floor Of 17 Bay Lockable Stores
PROJECT NAME
Construction Of Final Floor Of 17 Bay Lockable Stores
SECTOR
Economic
BUDGET
521,702.55
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#25 Construction Of 10 Seater Wc
PROJECT NAME
Construction Of 10 Seater Wc
SECTOR
Waterandwaste
BUDGET
183,450.13
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#26 Construction Of 1no. 6-Unit Classroom Block
PROJECT NAME
Construction Of 1no. 6-Unit Classroom Block
SECTOR
Education
BUDGET
500,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
completed
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
Lump Sum
#27 Provision Of Water Facilities In Selected Communities And Construction Of Market Shed At Light Industrial Area
PROJECT NAME
Provision Of Water Facilities In Selected Communities And Construction Of Market Shed At Light Industrial Area
SECTOR
Transport.Water
BUDGET
252,215.24
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#28 Construction Of 1no. 3 Unit Classroom Block With Acilliary Facility
PROJECT NAME
Construction Of 1no. 3 Unit Classroom Block With Acilliary Facility
SECTOR
Education
BUDGET
252,215.24
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#30 Renovation 14 Unit Classroom Block With Ancillary Facilities For Lagos Town M/A Primary School
PROJECT NAME
Renovation 14 Unit Classroom Block With Ancillary Facilities For Lagos Town M/A Primary School
SECTOR
Education
BUDGET
294,922.53
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
completed
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Admeasurement
#31 Construction Of 1no. 3 Unit Classroom Block With Ancillary Facilities At Akwidaa
PROJECT NAME
Construction Of 1no. 3 Unit Classroom Block With Ancillary Facilities At Akwidaa
SECTOR
Education
BUDGET
339,236.64
ENTITY
Ahanta West Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#34 Construction & Furnishing Of One(1) Community Based Planning Service (Chps) Compound At Adientem (Phase 1)
PROJECT NAME
Construction & Furnishing Of One(1) Community Based Planning Service (Chps) Compound At Adientem (Phase 1)
SECTOR
Health
BUDGET
488,241.10
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#36 Construction Of Storm Drain From Kojo Kumi Avenue, Kwesimintsim Total Filling Station And Kwesimintsim
PROJECT NAME
Construction Of Storm Drain From Kojo Kumi Avenue, Kwesimintsim Total Filling Station And Kwesimintsim
SECTOR
Transport.Road
BUDGET
3,297,752.30
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
completed
FUNDING SOURCE
World Bank
CONTRACT TYPE
Admeasurement
#37 Construction Of 1no. 2unit Classroom Block, Office And Store, Servery,4-Seater W/C With Borehole
PROJECT NAME
Construction Of 1no. 2unit Classroom Block, Office And Store, Servery,4-Seater W/C With Borehole
SECTOR
Education
BUDGET
413,479.06
ENTITY
Ahanta West Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#38 Construction Of 1no. 3-Unit Classroom Block
PROJECT NAME
Construction Of 1no. 3-Unit Classroom Block
SECTOR
Education
BUDGET
292,302.90
ENTITY
Mpohor District Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#39 Construction Of 1 No. 3 Unit Classroom Block At Sekyere Himan
PROJECT NAME
Construction Of 1 No. 3 Unit Classroom Block At Sekyere Himan
SECTOR
Education
BUDGET
331,443.26
ENTITY
Wassa East District Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#40 Construction Of 1 No. 16 Seater Wc Toilet With Mechanized Borehole At Nsadweso
PROJECT NAME
Construction Of 1 No. 16 Seater Wc Toilet With Mechanized Borehole At Nsadweso
SECTOR
Waterandwaste
BUDGET
186,678.45
ENTITY
Wassa East District Assembly
STAGE
completed
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
Admeasurement
#42 Construction Of 1no. 2-Unit Classroom Block
PROJECT NAME
Construction Of 1no. 2-Unit Classroom Block
SECTOR
Education
BUDGET
300,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
implementation
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
Lump Sum
#43 Construction Of 1no. 6-Unit Classroom Block
PROJECT NAME
Construction Of 1no. 6-Unit Classroom Block
SECTOR
Education
BUDGET
500,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
FUNDING SOURCE
Minerals Development Fund
CONTRACT TYPE
Lump Sum
#44 Construction Of 1 No 3 Unit Classroom Block With Ancillary Facility At Asemko
PROJECT NAME
Construction Of 1 No 3 Unit Classroom Block With Ancillary Facility At Asemko
SECTOR
Education
BUDGET
271,661.89
ENTITY
Ahanta West Municipal Assembly
STAGE
completed
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
construction
#46 Construction Of 1no. 3-Unit Classroom Block
PROJECT NAME
Construction Of 1no. 3-Unit Classroom Block
SECTOR
Education
BUDGET
400,000.00
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
construction
#47 Construction Of Open Shed
PROJECT NAME
Construction Of Open Shed
SECTOR
Waterandwaste
BUDGET
196,077.40
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
Uk-Aid Direct
CONTRACT TYPE
Lump Sum
#48 Construction Of Chps Compound At Komfueku
PROJECT NAME
Construction Of Chps Compound At Komfueku
SECTOR
Health
BUDGET
495,939.36
ENTITY
Shama District Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Lump Sum
#49 Construction Of 1 No 3 – Unit Classroom Block With Ancillary Facilities
PROJECT NAME
Construction Of 1 No 3 – Unit Classroom Block With Ancillary Facilities
SECTOR
Education
BUDGET
242,285.32
ENTITY
Ahanta West Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Lump Sum
#50 Construction Of Community Park With Ancillary Facilities Phase 1
PROJECT NAME
Construction Of Community Park With Ancillary Facilities Phase 1
SECTOR
Culturesportsandrecreation
BUDGET
549,646.38
ENTITY
Shama District Assembly
STAGE
completion
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Lump Sum
#52 Construction Of Four Unit Teachers Bedroom With Ancillary Facilities For School For The Deaf
PROJECT NAME
Construction Of Four Unit Teachers Bedroom With Ancillary Facilities For School For The Deaf
SECTOR
Education
BUDGET
451,449.40
ENTITY
Shama District Assembly
STAGE
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Lump Sum
#53 Rehabilitation Of 12-Unit Classroom Block And Offices, 200 Bed Capacity Dormitory, Provision Of Street Light And Repair Of Existing Broken Fence Wall For School For The Deaf
PROJECT NAME
Rehabilitation Of 12-Unit Classroom Block And Offices, 200 Bed Capacity Dormitory, Provision Of Street Light And Repair Of Existing Broken Fence Wall For School For The Deaf
SECTOR
Education
BUDGET
456,635.45
ENTITY
Shama District Assembly
STAGE
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Lump Sum
#54 Construction Of Proposed Two (2) Storey
PROJECT NAME
Construction Of Proposed Two (2) Storey
SECTOR
Health
BUDGET
455,171.90
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
implementation
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Admeasurement
#55 Construction Of 1no. 32 Bay Partitioned Market Shed
PROJECT NAME
Construction Of 1no. 32 Bay Partitioned Market Shed
SECTOR
Economic
BUDGET
199,042.30
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#56 Construction Of 1no. 32 Bay Partitioned Market Shed ( Mpintsin Market)
PROJECT NAME
Construction Of 1no. 32 Bay Partitioned Market Shed ( Mpintsin Market)
SECTOR
Economic
BUDGET
192,861.54
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#57 Construction Of 1no. 40 Bay Partitioned Market Shed
PROJECT NAME
Construction Of 1no. 40 Bay Partitioned Market Shed
SECTOR
Health
BUDGET
230,122.60
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#58 Construction Of Proposed Teachers Accommodation.
PROJECT NAME
Construction Of Proposed Teachers Accommodation.
SECTOR
Education
BUDGET
303,982.36
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#59 Construction Of 1no. Fish Smoking Facility (Sekondi Beach Area)
PROJECT NAME
Construction Of 1no. Fish Smoking Facility (Sekondi Beach Area)
SECTOR
Economic
BUDGET
398,933.73
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#60 Construction Of Police Station At Gwira Banso
PROJECT NAME
Construction Of Police Station At Gwira Banso
SECTOR
Governance
BUDGET
237,541.91
ENTITY
Nzema East Municipal Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#61 Construction Of Male And Female Wards And Laboratory Facilities And Landscaping
PROJECT NAME
Construction Of Male And Female Wards And Laboratory Facilities And Landscaping
SECTOR
Health
BUDGET
545,651.30
ENTITY
Tarkwa Nsuaem Municipal Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Lump Sum
#62 Rehabilitation Of Municipal Health Directorate Office At Axim
PROJECT NAME
Rehabilitation Of Municipal Health Directorate Office At Axim
SECTOR
Health
BUDGET
170,231.18
ENTITY
Nzema East Municipal Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#63 Completion Of 6-Unit Classroom Block With Ancillary Facilities (Ground Floor Only)
PROJECT NAME
Completion Of 6-Unit Classroom Block With Ancillary Facilities (Ground Floor Only)
SECTOR
Education
BUDGET
471,922.19
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
implementation
FUNDING SOURCE
District Assemblies Common Fund
CONTRACT TYPE
Admeasurement
#64 Construction Of 2 – Unit Classroom Block With Dining Hall, Office, Kitchen, Toilet/Bath And External Works (Ground Floor Only)
PROJECT NAME
Construction Of 2 – Unit Classroom Block With Dining Hall, Office, Kitchen, Toilet/Bath And External Works (Ground Floor Only)
SECTOR
Education
BUDGET
388,920.97
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
FUNDING SOURCE
Ghana Education Trust Fund
CONTRACT TYPE
Admeasurement
#65 Construction Of 18m X 1.8m Pedestrian Footbridge At Kwesimintsim
PROJECT NAME
Construction Of 18m X 1.8m Pedestrian Footbridge At Kwesimintsim
SECTOR
Transport.Urban
BUDGET
80,204.00
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#66 Construction Of 1no. 2 Unit Classroom Block At Kakusuazo
PROJECT NAME
Construction Of 1no. 2 Unit Classroom Block At Kakusuazo
SECTOR
Education
BUDGET
175,278.82
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#67 Construction Of 1no. 3unit Classroom Block At Kakabo
PROJECT NAME
Construction Of 1no. 3unit Classroom Block At Kakabo
SECTOR
Education
BUDGET
548,214.70
ENTITY
Wassa East District Assembly
STAGE
completed
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#68 Construction Of 1no.Chps Compound At Himanso
PROJECT NAME
Construction Of 1no.Chps Compound At Himanso
SECTOR
Health
BUDGET
347,679.00
ENTITY
Wassa East District Assembly
STAGE
implementation
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#69 Construction Of Training Centre At Sekondi
PROJECT NAME
Construction Of Training Centre At Sekondi
SECTOR
Education
BUDGET
1,197,850.45
ENTITY
Sekondi-Takoradi Metropolitan Assembly
STAGE
implementation
FUNDING SOURCE
European Union (EU)
CONTRACT TYPE
Admeasurement
#70 Construction Of 1no. Mechanized Borehole At Tumentu
PROJECT NAME
Construction Of 1no. Mechanized Borehole At Tumentu
SECTOR
Socialhousing
BUDGET
32,000.00
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#71 Construction Of 1no.6 Unit Classroom Block, 1no. 3 Seater Toilet Facility, 1no. 2 Urinal Facility And 130 Dual Desk For Basic School At Ampansie
PROJECT NAME
Construction Of 1no.6 Unit Classroom Block, 1no. 3 Seater Toilet Facility, 1no. 2 Urinal Facility And 130 Dual Desk For Basic School At Ampansie
SECTOR
Education
BUDGET
750,079.27
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#72 Construction Of 1 No. Shed And Provision Of 5 Unit Stoves For Akyeke Production, Provision Of Basins And Water Drums, Office Fittings And Furniture, Provision Of Motor King And Orientation Training On Cassava Value Chain At Bokro Cassava Processing Centre
PROJECT NAME
Construction Of 1 No. Shed And Provision Of 5 Unit Stoves For Akyeke Production, Provision Of Basins And Water Drums, Office Fittings And Furniture, Provision Of Motor King And Orientation Training On Cassava Value Chain At Bokro Cassava Processing Centre
SECTOR
Economic
BUDGET
171,100.00
ENTITY
Nzema East Municipal Assembly
STAGE
FUNDING SOURCE
DACF - Responsiveness Factor Grant
CONTRACT TYPE
Admeasurement
#73 Rehabilitation Of 1.6km Wamco Effiakuma Road With 3mx2m Box Culvet,12mm Long Drain Culvert
PROJECT NAME
Rehabilitation Of 1.6km Wamco Effiakuma Road With 3mx2m Box Culvet,12mm Long Drain Culvert
SECTOR
Transport.Road
BUDGET
5,707,993.83
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
Admeasurement
#74 Construction Of Culverts With Roadside Drains And Culvert Approach Fillings At White Diamonds ,Anaji Choice Mart,Takoradi Technical Institute
PROJECT NAME
Construction Of Culverts With Roadside Drains And Culvert Approach Fillings At White Diamonds ,Anaji Choice Mart,Takoradi Technical Institute
SECTOR
Transport.Road
BUDGET
4,000,270.26
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
Admeasurement
#75 Construction Of Culverts With Culvert Approach Filling And Roadside Drains
PROJECT NAME
Construction Of Culverts With Culvert Approach Filling And Roadside Drains
SECTOR
Roads
BUDGET
3,599,351.95
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
Admeasurement
#76 Asphalt And Bitumen Surfacing Of Assakae-Whindo Road(2.0km) And Whindo Health Centere Road (5km)
PROJECT NAME
Asphalt And Bitumen Surfacing Of Assakae-Whindo Road(2.0km) And Whindo Health Centere Road (5km)
SECTOR
Roads
BUDGET
6,204,956.56
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
Admeasurement
#77 Construction Of 10no. Refuse Collection Points And Fabrication Of 10no Containers
PROJECT NAME
Construction Of 10no. Refuse Collection Points And Fabrication Of 10no Containers
SECTOR
Waterandwaste
BUDGET
1,786,353.58
ENTITY
Effia-Kwesimintsim Municipal Assembly
STAGE
FUNDING SOURCE
World Bank
CONTRACT TYPE
Lump Sum